Skip to main content
Phytion EcoTracer MONITOR. MEASURE. MONETIZE.
WORKSPACE Facilities Change workspace
FACILITYNorth Ridge DairyFARM-WI-01
CURRENT CONTEXTNorth Ridge Dairy
SECTIONNavigation
PAGENorth Ridge - Manure treatment
MANURE TREATMENT · PLANNED

North Ridge - Manure treatment

North Ridge Dairy · FARM-WI-01

Bioactive X54 dosing, mixing and solid/liquid separation.

Installed system

Status
PLANNED
Manure treatment
Equipment
06
6 linked records
Material routes
01
configured connections
Configuration
CP23-TEST-V1
Oct 17, 2026

DEP-NRTEST-TREATMENT-01 · North Ridge Dairy

Configured sequence · CP23-TEST-V1

Manure treatment

Transfer pump
Transfer pump illustration

North Ridge transfer pump

Inlet flow meter
Inlet flow meter illustration

Transfer flow meter

Bioactive X54
Bioactive X54 illustration

Material input · dose & lot

Water storage
Water storage illustration

Separated liquid · North Ridge water storage

Solids to processing trailer
Solids to processing trailer illustration

North Ridge - Reactor HHO

Liquid Solids HHO connection

Illustrated connections, not live operation. Open a process record for saved quantities. Trailer interior is a schematic cutaway. Dosing and flotation illustrate the sequence, not measured layer proportions.

System identity

Installation record

Deployment
DEP-NRTEST-TREATMENT-01
Technology version
NRTEST-TREATMENT-V1
Reporting scope
North Ridge Dairy
Installed
Not recorded
Commissioned
Not recorded
Configuration
CP23-TEST-V1As of Oct 17, 2026
Process sequence

Configured stages

  1. Metered manure transfer
  2. Bioactive X54 dosing
  3. Mixing
  4. Solid/liquid separation
  5. Liquid to water storage
  6. Solids to reactor

Material input · Bioactive X54

Connected equipment

Equipment & roles

AGITATION

North Ridge agitator

NRTEST-AG-01 · Linked equipment
Open equipment →
PRIMARY PROCESS

North Ridge treatment assembly

NRTEST-TREATMENT-01 · Linked equipment
Open equipment →
SOURCE TANK

North Ridge source tank

NRTEST-TANK-01 · Linked equipment
Open equipment →
TRANSFER METER

Transfer flow meter

NRTEST-FM-OUT-01 · Linked equipment
Open equipment →
TRANSFER PUMP

North Ridge transfer pump

NRTEST-PU-01 · Linked equipment
Open equipment →
WATER STORAGE

North Ridge water storage

NRTEST-WATER-01 · Linked equipment
Open equipment →
Material destinations

Connected systems

SEPARATED SOLIDS

To North Ridge - Reactor HHO

Configured route

Open connected system →
Configuration history · 1 revisions

CP23-TEST-V1

MANURE TREATMENT · Oct 1, 2026 – Open ended

View configuration →

Configuration dates identify system definitions. Installation and commissioning dates remain separate.