Skip to main content
Phytion EcoTracer MONITOR. MEASURE. MONETIZE.
WORKSPACE Facilities Change workspace
FACILITYNonn Family FarmFARM-WI-NONN-01
CURRENT CONTEXTNonn Family Farm
SECTIONOperations
PAGEProcessing Events
Recorded facility activity

FACILITY OPERATIONS · PROCESSING

Processing Events

Recorded movement. Traceable evidence.

Follow measured material movement from equipment to a recorded event. Review throughput, inspect the route and open its supporting evidence.

Processing history

Reading quality review

Cumulative facility history. All recorded source-facility events, including retired tanks. Register filters apply below. Gross throughput may include repeat processing of the same material.

Volume: 0 missing · 0 negativeDuration: 0 interval exceptionsReading quality: 26 other · 0 missing

Completed volume coverage

Completed volume

Usable volume
231 events
Missing volume
0 events
Negative volume
0 events
Volume coverage
100.0%

Completed events with recorded, nonnegative meter volume. Recorded zero is included; missing and negative values are excluded.

Latest completed day

Latest completed day: Oct 17, 2026. 2,157.00 gal. Usable volume from 3 of 3 completed events. Recorded start date · all facility events that day.

Recorded population & reading quality

Recorded population

All events
231
Completed
231
Other status
0
Completion share
100.0%

Recorded start dates: Aug 1, 2026 – Oct 17, 2026.

All-event reading quality

GOOD
205
Other quality
26
Missing quality
0
GOOD share
88.7%

Recorded reading codes cover all events. GOOD does not establish complete evidence or accounting acceptance.

Average completed volume basis

Recorded inputs

Completed volume
148,599.80 gal
Events with usable volume
231
Average completed volume
643.29 gal

Included population

Completed events with recorded, nonnegative meter volume. Recorded zero is included; missing and negative values are excluded. The average uses events with usable volume rather than all recorded events.

Usable volume from 231 of 231 completed events.

Completed duration coverage

Completed duration

Valid intervals
231
Interval exceptions
0

Only positive recorded start/end intervals enter the duration average. This population is independent of volume availability.

Average duration

13.5 min from 231 completed events with valid intervals.

These counts overlap across checks and must not be added as a count of distinct issues. A dash means unavailable or no applicable denominator.

EVENT REGISTER

Controlled processing records

Each file preserves its material route, equipment, measured volume, duration, solids profile, completion state, and reading quality.

REGISTERED FILES 231 recorded processing events
SORT REGISTER Sort using the boxed arrows · open an event file or follow its equipment links
FacilityNonn Family Farm FARM-WI-NONN-01
Processing event file Event #10132 Aug 24, 2026 12:00 PM – 12:13 PM

Sign in to view saved project context.

Processed 676.94 gal
Duration 13.5 min
In completed throughput
Route & measurements
Tank start
1,676.94 gal
Tank end
1,000.00 gal
Total solids
8.0%
Volatile solids
78.0%
Technical references
Source tank
TK-FFB5DEDCE9EE4B73B
Water storage
NONN-WATER-01
Processing event file Event #10131 Aug 24, 2026 9:00 AM – 9:11 AM

Sign in to view saved project context.

Processed 597.30 gal
Duration 11.9 min
In completed throughput
Route & measurements
Tank start
1,597.30 gal
Tank end
1,000.00 gal
Total solids
8.0%
Volatile solids
78.0%
Technical references
Source tank
TK-FFB5DEDCE9EE4B73B
Water storage
NONN-WATER-01
Processing event file Event #10130 Aug 23, 2026 3:00 PM – 3:13 PM

Sign in to view saved project context.

Processed 698.16 gal
Duration 14.0 min
In completed throughput
Route & measurements
Tank start
1,698.16 gal
Tank end
1,000.00 gal
Total solids
8.0%
Volatile solids
78.0%
Technical references
Source tank
TK-FFB5DEDCE9EE4B73B
Water storage
NONN-WATER-01
Processing event file Event #10129 Aug 23, 2026 12:00 PM – 12:12 PM

Sign in to view saved project context.

Processed 648.28 gal
Duration 13.0 min
In completed throughput
Route & measurements
Tank start
1,648.28 gal
Tank end
1,000.00 gal
Total solids
8.0%
Volatile solids
78.0%
Technical references
Source tank
TK-FFB5DEDCE9EE4B73B
Water storage
NONN-WATER-01
Processing event file Event #10128 Aug 23, 2026 9:00 AM – 9:11 AM

Sign in to view saved project context.

Processed 571.56 gal
Duration 11.4 min
In completed throughput
Route & measurements
Tank start
1,571.56 gal
Tank end
1,000.00 gal
Total solids
8.0%
Volatile solids
78.0%
Technical references
Source tank
TK-FFB5DEDCE9EE4B73B
Water storage
NONN-WATER-01

Accounting handoff. Processing records supply activity evidence for method calculations. Evidence review and result authorization govern posting to the ledger.

Open Accounting