Skip to main content
Phytion EcoTracer MONITOR. MEASURE. MONETIZE.
WORKSPACE Facilities Change workspace
FACILITYNonn Family FarmFARM-WI-NONN-01
CURRENT CONTEXTNonn Family Farm
SECTIONOperations
PAGEProcessing Events
Recorded facility activity

FACILITY OPERATIONS · PROCESSING

Processing Events

Recorded movement. Traceable evidence.

Follow measured material movement from equipment to a recorded event. Review throughput, inspect the route and open its supporting evidence.

Processing history

Reading quality review

Cumulative facility history. All recorded source-facility events, including retired tanks. Register filters apply below. Gross throughput may include repeat processing of the same material.

Volume: 0 missing · 0 negativeDuration: 0 interval exceptionsReading quality: 23 other · 0 missing

Completed volume coverage

Completed volume

Usable volume
228 events
Missing volume
0 events
Negative volume
0 events
Volume coverage
100.0%

Completed events with recorded, nonnegative meter volume. Recorded zero is included; missing and negative values are excluded.

Latest completed day

Latest completed day: Oct 16, 2026. 2,238.00 gal. Usable volume from 3 of 3 completed events. Recorded start date · all facility events that day.

Recorded population & reading quality

Recorded population

All events
228
Completed
228
Other status
0
Completion share
100.0%

Recorded start dates: Aug 1, 2026 – Oct 16, 2026.

All-event reading quality

GOOD
205
Other quality
23
Missing quality
0
GOOD share
89.9%

Recorded reading codes cover all events. GOOD does not establish complete evidence or accounting acceptance.

Average completed volume basis

Recorded inputs

Completed volume
146,442.80 gal
Events with usable volume
228
Average completed volume
642.29 gal

Included population

Completed events with recorded, nonnegative meter volume. Recorded zero is included; missing and negative values are excluded. The average uses events with usable volume rather than all recorded events.

Usable volume from 228 of 228 completed events.

Completed duration coverage

Completed duration

Valid intervals
228
Interval exceptions
0

Only positive recorded start/end intervals enter the duration average. This population is independent of volume availability.

Average duration

13.4 min from 228 completed events with valid intervals.

These counts overlap across checks and must not be added as a count of distinct issues. A dash means unavailable or no applicable denominator.

EVENT REGISTER

Controlled processing records

Each file preserves its material route, equipment, measured volume, duration, solids profile, completion state, and reading quality.

REGISTERED FILES 228 recorded processing events
SORT REGISTER Sort using the boxed arrows · open an event file or follow its equipment links
FacilityNonn Family Farm FARM-WI-NONN-01
Processing event file Event #10089 Aug 10, 2026 9:00 AM – 9:11 AM

Sign in to view saved project context.

Processed 588.25 gal
Duration 11.8 min
In completed throughput
Route & measurements
Tank start
1,588.25 gal
Tank end
1,000.00 gal
Total solids
8.0%
Volatile solids
78.0%
Technical references
Source tank
TK-FFB5DEDCE9EE4B73B
Water storage
NONN-WATER-01
Processing event file Event #10088 Aug 9, 2026 3:00 PM – 3:13 PM

Sign in to view saved project context.

Processed 680.55 gal
Duration 13.6 min
In completed throughput
Route & measurements
Tank start
1,680.55 gal
Tank end
1,000.00 gal
Total solids
8.0%
Volatile solids
78.0%
Technical references
Source tank
TK-FFB5DEDCE9EE4B73B
Water storage
NONN-WATER-01
Processing event file Event #10087 Aug 9, 2026 12:00 PM – 12:13 PM

Sign in to view saved project context.

Processed 657.75 gal
Duration 13.2 min
In completed throughput
Route & measurements
Tank start
1,657.75 gal
Tank end
1,000.00 gal
Total solids
8.0%
Volatile solids
78.0%
Technical references
Source tank
TK-FFB5DEDCE9EE4B73B
Water storage
NONN-WATER-01
Processing event file Event #10086 Aug 9, 2026 9:00 AM – 9:11 AM

Sign in to view saved project context.

Processed 562.70 gal
Duration 11.2 min
In completed throughput
Route & measurements
Tank start
1,562.70 gal
Tank end
1,000.00 gal
Total solids
8.0%
Volatile solids
78.0%
Technical references
Source tank
TK-FFB5DEDCE9EE4B73B
Water storage
NONN-WATER-01
Processing event file Event #10085 Aug 8, 2026 3:00 PM – 3:13 PM

Sign in to view saved project context.

Processed 661.74 gal
Duration 13.2 min
In completed throughput
Route & measurements
Tank start
1,661.74 gal
Tank end
1,000.00 gal
Total solids
8.0%
Volatile solids
78.0%
Technical references
Source tank
TK-FFB5DEDCE9EE4B73B
Water storage
NONN-WATER-01
Processing event file Event #10084 Aug 8, 2026 12:00 PM – 12:12 PM

Sign in to view saved project context.

Processed 628.83 gal
Duration 12.6 min
In completed throughput
Route & measurements
Tank start
1,628.83 gal
Tank end
1,000.00 gal
Total solids
8.0%
Volatile solids
78.0%
Technical references
Source tank
TK-FFB5DEDCE9EE4B73B
Water storage
NONN-WATER-01
Processing event file Event #10083 Aug 8, 2026 9:00 AM – 9:10 AM

Sign in to view saved project context.

Processed 537.43 gal
Duration 10.8 min
In completed throughput
Route & measurements
Tank start
1,537.43 gal
Tank end
1,000.00 gal
Total solids
8.0%
Volatile solids
78.0%
Technical references
Source tank
TK-FFB5DEDCE9EE4B73B
Water storage
NONN-WATER-01
Processing event file Event #10082 Aug 7, 2026 3:00 PM – 3:14 PM

Sign in to view saved project context.

Processed 715.90 gal
Duration 14.3 min
In completed throughput
Route & measurements
Tank start
1,715.90 gal
Tank end
1,000.00 gal
Total solids
8.0%
Volatile solids
78.0%
Technical references
Source tank
TK-FFB5DEDCE9EE4B73B
Water storage
NONN-WATER-01
Processing event file Event #10081 Aug 7, 2026 12:00 PM – 12:13 PM

Sign in to view saved project context.

Processed 668.95 gal
Duration 13.4 min
In completed throughput
Route & measurements
Tank start
1,668.95 gal
Tank end
1,000.00 gal
Total solids
8.0%
Volatile solids
78.0%
Technical references
Source tank
TK-FFB5DEDCE9EE4B73B
Water storage
NONN-WATER-01
Processing event file Event #10080 Aug 7, 2026 9:00 AM – 9:11 AM

Sign in to view saved project context.

Processed 571.15 gal
Duration 11.4 min
In completed throughput
Route & measurements
Tank start
1,571.15 gal
Tank end
1,000.00 gal
Total solids
8.0%
Volatile solids
78.0%
Technical references
Source tank
TK-FFB5DEDCE9EE4B73B
Water storage
NONN-WATER-01
Processing event file Event #10079 Aug 6, 2026 3:00 PM – 3:13 PM

Sign in to view saved project context.

Processed 696.71 gal
Duration 13.9 min
In completed throughput
Route & measurements
Tank start
1,696.71 gal
Tank end
1,000.00 gal
Total solids
8.0%
Volatile solids
78.0%
Technical references
Source tank
TK-FFB5DEDCE9EE4B73B
Water storage
NONN-WATER-01
Processing event file Event #10078 Aug 6, 2026 12:00 PM – 12:12 PM

Sign in to view saved project context.

Processed 640.22 gal
Duration 12.8 min
In completed throughput
Route & measurements
Tank start
1,640.22 gal
Tank end
1,000.00 gal
Total solids
8.0%
Volatile solids
78.0%
Technical references
Source tank
TK-FFB5DEDCE9EE4B73B
Water storage
NONN-WATER-01
Processing event file Event #10077 Aug 6, 2026 9:00 AM – 9:10 AM

Sign in to view saved project context.

Processed 546.07 gal
Duration 10.9 min
In completed throughput
Route & measurements
Tank start
1,546.07 gal
Tank end
1,000.00 gal
Total solids
8.0%
Volatile solids
78.0%
Technical references
Source tank
TK-FFB5DEDCE9EE4B73B
Water storage
NONN-WATER-01
Processing event file Event #10076 Aug 5, 2026 3:00 PM – 3:13 PM

Sign in to view saved project context.

Processed 676.94 gal
Duration 13.5 min
In completed throughput
Route & measurements
Tank start
1,676.94 gal
Tank end
1,000.00 gal
Total solids
8.0%
Volatile solids
78.0%
Technical references
Source tank
TK-FFB5DEDCE9EE4B73B
Water storage
NONN-WATER-01
Processing event file Event #10075 Aug 5, 2026 12:00 PM – 12:12 PM

Sign in to view saved project context.

Processed 611.78 gal
Duration 12.2 min
In completed throughput
Route & measurements
Tank start
1,611.78 gal
Tank end
1,000.00 gal
Total solids
8.0%
Volatile solids
78.0%
Technical references
Source tank
TK-FFB5DEDCE9EE4B73B
Water storage
NONN-WATER-01
Processing event file Event #10074 Aug 5, 2026 9:00 AM – 9:10 AM

Sign in to view saved project context.

Processed 521.28 gal
Duration 10.4 min
In completed throughput
Route & measurements
Tank start
1,521.28 gal
Tank end
1,000.00 gal
Total solids
8.0%
Volatile solids
78.0%
Technical references
Source tank
TK-FFB5DEDCE9EE4B73B
Water storage
NONN-WATER-01
Processing event file Event #10073 Aug 4, 2026 3:00 PM – 3:14 PM

Sign in to view saved project context.

Processed 732.56 gal
Duration 14.7 min
In completed throughput
Route & measurements
Tank start
1,732.56 gal
Tank end
1,000.00 gal
Total solids
8.0%
Volatile solids
78.0%
Technical references
Source tank
TK-FFB5DEDCE9EE4B73B
Water storage
NONN-WATER-01
Processing event file Event #10072 Aug 4, 2026 12:00 PM – 12:13 PM

Sign in to view saved project context.

Processed 651.17 gal
Duration 13.0 min
In completed throughput
Route & measurements
Tank start
1,651.17 gal
Tank end
1,000.00 gal
Total solids
8.0%
Volatile solids
78.0%
Technical references
Source tank
TK-FFB5DEDCE9EE4B73B
Water storage
NONN-WATER-01
Processing event file Event #10071 Aug 4, 2026 9:00 AM – 9:11 AM

Sign in to view saved project context.

Processed 554.27 gal
Duration 11.1 min
In completed throughput
Route & measurements
Tank start
1,554.27 gal
Tank end
1,000.00 gal
Total solids
8.0%
Volatile solids
78.0%
Technical references
Source tank
TK-FFB5DEDCE9EE4B73B
Water storage
NONN-WATER-01
Processing event file Event #10070 Aug 3, 2026 3:00 PM – 3:14 PM

Sign in to view saved project context.

Processed 712.43 gal
Duration 14.2 min
In completed throughput
Route & measurements
Tank start
1,712.43 gal
Tank end
1,000.00 gal
Total solids
8.0%
Volatile solids
78.0%
Technical references
Source tank
TK-FFB5DEDCE9EE4B73B
Water storage
NONN-WATER-01
Processing event file Event #10069 Aug 3, 2026 12:00 PM – 12:12 PM

Sign in to view saved project context.

Processed 622.91 gal
Duration 12.4 min
In completed throughput
Route & measurements
Tank start
1,622.91 gal
Tank end
1,000.00 gal
Total solids
8.0%
Volatile solids
78.0%
Technical references
Source tank
TK-FFB5DEDCE9EE4B73B
Water storage
NONN-WATER-01
Processing event file Event #10068 Aug 3, 2026 9:00 AM – 9:10 AM

Sign in to view saved project context.

Processed 529.66 gal
Duration 10.6 min
In completed throughput
Route & measurements
Tank start
1,529.66 gal
Tank end
1,000.00 gal
Total solids
8.0%
Volatile solids
78.0%
Technical references
Source tank
TK-FFB5DEDCE9EE4B73B
Water storage
NONN-WATER-01
Processing event file Event #10067 Aug 2, 2026 3:00 PM – 3:15 PM

Sign in to view saved project context.

Processed 769.29 gal
Duration 15.4 min
In completed throughput
Route & measurements
Tank start
1,769.29 gal
Tank end
1,000.00 gal
Total solids
8.0%
Volatile solids
78.0%
Technical references
Source tank
TK-FFB5DEDCE9EE4B73B
Water storage
NONN-WATER-01
Processing event file Event #10066 Aug 2, 2026 12:00 PM – 12:13 PM

Sign in to view saved project context.

Processed 661.68 gal
Duration 13.2 min
In completed throughput
Route & measurements
Tank start
1,661.68 gal
Tank end
1,000.00 gal
Total solids
8.0%
Volatile solids
78.0%
Technical references
Source tank
TK-FFB5DEDCE9EE4B73B
Water storage
NONN-WATER-01
Processing event file Event #10065 Aug 2, 2026 9:00 AM – 9:11 AM

Sign in to view saved project context.

Processed 562.03 gal
Duration 11.2 min
In completed throughput
Route & measurements
Tank start
1,562.03 gal
Tank end
1,000.00 gal
Total solids
8.0%
Volatile solids
78.0%
Technical references
Source tank
TK-FFB5DEDCE9EE4B73B
Water storage
NONN-WATER-01

Accounting handoff. Processing records supply activity evidence for method calculations. Evidence review and result authorization govern posting to the ledger.

Open Accounting