Skip to main content
Phytion EcoTracer MONITOR. MEASURE. MONETIZE.
WORKSPACE Environmental Solutions Change workspace
REPORTING SCOPENorth Ridge Dairy
CURRENT CONTEXTNorth Ridge - Reactor HHONorth Ridge Dairy
SECTIONNavigation
PAGENorth Ridge - Reactor HHO
PLANNED FACILITY
DEP-NRTEST-REACTOR-HHO-01

North Ridge - Reactor HHO

Processing trailer

Equipment, evidence and results for this installation.

Deployment summary

Reporting scope
North Ridge Dairy
FACILITY
Installed assets
03
Effective Oct 17, 2026
Channel map
00 / 04
Sources configured
Required sources
00 / 04
Required sources mapped
Active methods
00
Effective assignments
Ledger entries · all history
Not assessed
No evidence period linked

Configuration effective on the selected date; ledger counts cover all recorded history.

PLANNED Configuration requires attention
Controlled version
North Ridge - Reactor HHO configuration
Owner
North Ridge Dairy
Installed
Not recorded
Commissioned
Not recorded
Deployment notes

Current treatment and HHO configuration based on the Nonn equipment layout. North Ridge operating scenarios are maintained separately.

Cutaway of the trailer containing the solids drying reactor and HHO unit. Received solids, dry output and energy readings remain traceable.

Configuration describes the installation. Linked period evidence and a posted ledger record establish its accounted results.

RECORDED FACILITY CALCULATIONS

Sign in to inspect recorded runs

Recorded calculations linked to this deployment.

Sign in to inspect this deployment's recorded facility calculations.

Sign in
DEPLOYMENT CONTEXT

Facility & recorded evidence

Follow this installation into its saved source records.

FACILITY · REGISTERED CONTEXT

North Ridge Dairy

Fond du Lac, WI, US

Fixed facility
Facility code
FARM-WI-01
Facility timezone
America/Chicago
Reporting scope
North Ridge Dairy
Inspect facility context & evidence scope

Recorded history

Accepted telemetry includes warnings; superseded readings are excluded. Processing counts only directly linked events. Zero links does not mean a facility has no processing records.

No saved evidence assessment for this deployment's current technology version. Readiness is not established.

Facility location

The facility record owns this installation’s location details. GPS observations belong to their registered receivers and equipment; they do not supply the facility’s address.

The timezone identifies the facility’s operating context. Each recorded calculation and report retains its own date basis.

01 · IMPLEMENTATION CONTROL MAP

Deployment readiness

Configuration, evidence and accounting are reviewed separately.

AS OF 2026-10-17
01 OPERATING BOUNDARYNorth Ridge Dairy

FACILITY · North Ridge Dairy

SCOPE ALIGNED
02 INSTALLED NETWORK3 assets enrolled

North Ridge reactor HHO module

EFFECTIVE
03 EVIDENCE INTERFACE0 / 4 channels mapped

Open the period workspace to inspect readings, coverage, freshness, gaps and rejections.

MAP INCOMPLETE
04 CONTROLLED METHOD0 assignments

Method assignment pending

REVIEW REQUIRED

Installed assets

Equipment enrolled in this deployment, including records outside the selected effective date.

3 records · 3 effective on Oct 17, 2026
Installed assets on Oct 17, 2026, including other effective windows
Asset / roleModel / serialEvidence channelsEffective windowState
Asset / role
HHO MODULE · PRIMARY

North Ridge reactor HHO module

NRTEST-HHO-REACTOR-01 · ENVIRONMENTAL SOLUTION · HHO REACTOR MODULE
Model / serialNot recordedSerial · Not recorded Evidence channels
Effective channels
00
Effective window
From
Oct 1, 2026
To
Not recorded
StateENROLLED
Asset / role
CARRIER

North Ridge HHO processing trailer

NRTEST-HHO-01 · PROCESSING · HHO PROCESSING TRAILER
Model / serialNot recordedSerial · Not recorded Evidence channels
Effective channels
00
Effective window
From
Oct 1, 2026
To
Not recorded
StateENROLLED
Asset / role
HOST REACTOR

North Ridge solids drying reactor

NRTEST-REACTOR-01 · ENVIRONMENTAL SOLUTION · SOLIDS DRYING REACTOR
Model / serialNot recordedSerial · Not recorded Evidence channels
Effective channels
04
Effective window
From
Oct 1, 2026
To
Not recorded
StateENROLLED

Evidence channels

Channel definitions and source mappings for the selected date.

4 effective · 0 source mappings
Effective channel configuration
ChannelEquipmentSourceConfiguration
Channel
ENERGY INPUT · REQUIRED

Reactor system energy input

Parameter not linked · kWh
EquipmentNorth Ridge solids drying reactor SourceNot mapped ConfigurationREVIEW
Channel
MATERIAL INPUT · REQUIRED

Wet solids input

Parameter not linked · kg
EquipmentNorth Ridge solids drying reactor SourceNot mapped ConfigurationREVIEW
Channel
MATERIAL OUTPUT · REQUIRED

Dry solids output

Parameter not linked · kg
EquipmentNorth Ridge solids drying reactor SourceNot mapped ConfigurationREVIEW
Channel
OPERATING TIME · REQUIRED

Drying duration

Parameter not linked · h
EquipmentNorth Ridge solids drying reactor SourceNot mapped ConfigurationREVIEW

Methods & outcomes

Outcome definitions and effective method assignments.

0 outcomes · 0 effective assignments

No outcomes configured

Connect defined outcomes and an effective deployment method.

05 · SOURCE-TO-RESULT LINEAGE

Source & result history

Ledger values appear only when an actual Environmental Ledger record is linked.

Controlled accounting · recorded sources

Recorded period postings

Locked ledger entries matching the selected source period. Each receipt retains one whole-period quantity.

POSTINGS—
Recorded postings unavailable

Current scope read access is required to load these entries.

No source lineage in this viewConfigured channels remain visible above, but no source record, calculation run, or ledger result matches the selected period.