FACILITY · Nonn Family Farm
SCOPE ALIGNEDNonn Farm - Reactor HHO System
Processing trailer
Equipment, evidence and results for this installation.
Deployment summary
- Reporting scope
- Nonn Family Farm
- FACILITY
- Installed assets
- 03
- Effective Oct 17, 2026
- Channel map
- 00 / 04
- Sources configured
- Required sources
- 00 / 04
- Required sources mapped
- Active methods
- 00
- Effective assignments
- Ledger entries · all history
- Not assessed
- No evidence period linked
Configuration effective on the selected date; ledger counts cover all recorded history.
Deployment notes
HHO unit on the solids drying reactor. Receives separated solids from manure treatment. Drying quantities, moisture and energy are recorded per operating event.
Cutaway of the trailer containing the solids drying reactor and HHO unit. Received solids, dry output and energy readings remain traceable.
Configuration describes the installation. Linked period evidence and a posted ledger record establish its accounted results.
Sign in to inspect recorded runs
Recorded calculations linked to this deployment.
Sign in to inspect this deployment's recorded facility calculations.
Sign inFacility & recorded evidence
Follow this installation into its saved source records.
Nonn Family Farm
Cross Plains, WI, US
Inspect facility context & evidence scope
Recorded history
Accepted telemetry includes warnings; superseded readings are excluded. Processing counts only directly linked events. Zero links does not mean a facility has no processing records.
No saved evidence assessment for this deployment's current technology version. Readiness is not established.
Facility location
The facility record owns this installation’s location details. GPS observations belong to their registered receivers and equipment; they do not supply the facility’s address.
The timezone identifies the facility’s operating context. Each recorded calculation and report retains its own date basis.
Deployment readiness
Configuration, evidence and accounting are reviewed separately.
Nonn reactor HHO unit
EFFECTIVEOpen the period workspace to inspect readings, coverage, freshness, gaps and rejections.
MAP INCOMPLETEMethod assignment pending
REVIEW REQUIREDNo realized total is claimed from configuration alone.
NOT ASSESSED Facility reporting · all historyInstalled assets
Equipment enrolled in this deployment, including records outside the selected effective date.
3 records · 3 effective on Oct 17, 2026| Asset / role | Model / serial | Evidence channels | Effective window | State |
|---|---|---|---|---|
| Asset / role HHO MODULE · PRIMARY Nonn reactor HHO unitNONN-HHO-REACTOR-01 · ENVIRONMENTAL SOLUTION · HHO REACTOR MODULE |
Model / serialNot recordedSerial · Not recorded | Evidence channels
|
Effective window
|
StateENROLLED |
| Asset / role CARRIER HHO processing trailerNONN-HHO-01 · PROCESSING · HHO PROCESSING TRAILER |
Model / serialNot recordedSerial · Not recorded | Evidence channels
|
Effective window
|
StateENROLLED |
| Asset / role HOST REACTOR Nonn solids drying reactorNONN-REACTOR-01 · ENVIRONMENTAL SOLUTION · SOLIDS DRYING REACTOR |
Model / serialNot recordedSerial · Not recorded | Evidence channels
|
Effective window
|
StateENROLLED |
No records match. Clear the filters to show this register again.
Evidence channels
Channel definitions and source mappings for the selected date.
4 effective · 0 source mappings| Channel | Equipment | Source | Configuration |
|---|---|---|---|
| Channel ENERGY INPUT · REQUIRED Reactor system energy inputParameter not linked · kWh |
EquipmentNonn solids drying reactor | SourceNot mapped | ConfigurationREVIEW |
| Channel MATERIAL INPUT · REQUIRED Wet solids inputParameter not linked · kg |
EquipmentNonn solids drying reactor | SourceNot mapped | ConfigurationREVIEW |
| Channel MATERIAL OUTPUT · REQUIRED Dry solids outputParameter not linked · kg |
EquipmentNonn solids drying reactor | SourceNot mapped | ConfigurationREVIEW |
| Channel OPERATING TIME · REQUIRED Drying durationParameter not linked · h |
EquipmentNonn solids drying reactor | SourceNot mapped | ConfigurationREVIEW |
No records match. Clear the filters to show this register again.
Methods & outcomes
Outcome definitions and effective method assignments.
0 outcomes · 0 effective assignmentsNo outcomes configured
Connect defined outcomes and an effective deployment method.
Source & result history
Ledger values appear only when an actual Environmental Ledger record is linked.
Recorded period postings
Locked ledger entries matching the selected source period. Each receipt retains one whole-period quantity.
Current scope read access is required to load these entries.

