SECTIONNavigation
PAGENorth Ridge - Reactor HHO
REACTOR HHO · PLANNED

North Ridge - Reactor HHO

North Ridge Dairy · FARM-WI-01

Separated solids enter the reactor for drying with the mounted HHO unit.

Installed system

Status
PLANNED
Reactor HHO
Equipment
03
3 linked records
Material routes
01
configured connections
Configuration
CP23-TEST-V1
Oct 17, 2026

DEP-NRTEST-REACTOR-HHO-01 · North Ridge Dairy

Configured sequence · CP23-TEST-V1

From separated solids to dry output

Preparing system view…

Receive → dry → dischargeInspect components
Equipment & source links
System identity

Installation record

Deployment
DEP-NRTEST-REACTOR-HHO-01
Technology version
NRTEST-REACTOR-HHO-V1
Reporting scope
North Ridge Dairy
Installed
Not recorded
Commissioned
Not recorded
Configuration
CP23-TEST-V1As of Oct 17, 2026
Process sequence

Configured stages

  1. Wet solids received
  2. Reactor drying with HHO
  3. Dry solids output
Connected equipment

Equipment & roles

CARRIER

North Ridge HHO processing trailer

NRTEST-HHO-01 · Linked equipment
Open equipment →
HHO MODULE

North Ridge reactor HHO module

NRTEST-HHO-REACTOR-01 · Linked equipment
Open equipment →
HOST REACTOR

North Ridge solids drying reactor

NRTEST-REACTOR-01 · Linked equipment
Open equipment →
Material destinations

Connected systems

SEPARATED SOLIDS

From North Ridge - Manure treatment

Configured route

Open connected system →
Configuration history · 1 revisions

CP23-TEST-V1

REACTOR HHO · Oct 1, 2026 – Open ended

View configuration →